This week’s conversation is with Matthew Satterwhite, head of U.S. policy for National Grid. This week National Grid released a report in collaboration with S&P Global I found noteworthy amidst the data center backlash, asserting that building new transmission lines can potentially reduce consumer costs. I reached out asking if we could chat about how this argument leans into the fight over hyperscale infrastructure. I found our conversation illuminating and educational.

The following Q&A was lightly edited for clarity.

Why did you make this report?

It’s all focused on our customers. We’re always looking to find ways to make sure we can provide our service in the most affordable way possible, the most efficient way possible, and we always think of transmission, but it’s fallen out of favor recently. There’s so much demand with large loads, data centers, advanced manufacturing, reshoring. There’s such a need, and a lot of the debate has been focused on what we need on the generation side. We think transmission is an answer, as well.

We focused on what we have control over — since we’re in deregulated states, the only generation we’re doing is to help states reach their renewable goals. It’s a real page-turner. We really get to the core of everything.

Can we lower customer bills with transmission? This report actually showed us that’s a good investment and helps with the resource adequacy and the constraint problems we have in the Northeast. You can bring cheaper electricity in.

With respect to concerns for everyday consumers, how much do you feel like new transmission might alleviate ordinary Americans’ concerns about rising energy prices?

When you look at the demand that’s coming, the projection is that by 2035, we’ll have to add 45 gigawatts, currently. We’re on that path right now. Transmission alone isn’t going to meet that, but the question is, how do we temper that down? What do we do as National Grid to help alleviate the need for all that demand? Can we get that somewhere else rather than in the region by building generation? It's a different version of all of the above. It’s not a generation single answer or a transmission single answer. We think transmission is a big part of that.

This also allows you to bring in cleaner energy from other places. The more robust the network is, you can have energy in different places and bring that in. It replaces the need for some of the generation to be built and pays for itself by creating a cheaper return for customers adding this.

How much of the data center backlash is affecting your transmission project planning calculus? How is it changing what lines are built in the country?

We’re focused on how we can provide the cheapest service for our customers and physics. It’s science and long-term planning. We don’t have the luxury — we can’t follow, this month we’re thinking something, someone got mad, and so we’re thinking something else. We study a lot of science and physics to figure out how to build the grid.

Do you feel like the average Joe Schmoe American sees transmission as making their life less expensive and making their electricity more reliable?

I think there’s frustration and a lack of understanding about the industry overall. There’s fear of the unknown. Are data centers really driving everything that’s happening? That’s where I think, with reports like this, the benefit of it will be that people will read this and see there’s other things we can do to address the load that we need, something different than building a bunch of generation plants.

How do the question marks around whether data centers get built affect transmission planning? How much harder is the backlash making your job?

It’s a science question. Do we do a bunch of work and then nothing happens? That’s why states put their policies out. There’s multiple studies you go through with a region and with a utility. I think that’s one reason why you see states slowing down, to make sure the policy is in check so people don’t do work they don’t need to do. It’s about having the policy to make sure, if you’re studying something, you’re doing it with a purpose.

Yellow

This article is exclusively
for Heatmap Plus subscribers.

Go deeper inside the politics, projects, and personalities
shaping the energy transition.
To continue reading
Create a free account or sign in to unlock more free articles.
or
Please enter an email address
By continuing, you agree to the Terms of Service and acknowledge our Privacy Policy
Hotspots

A Big Battery Relief in New York

And more of the week’s top news around project fights.

•
The United States.
Heatmap Illustration/Getty Images

1. Suffolk County, New York – Rarely do I get to say battery fire fears can be quelched but we have a very good example brewing in the Empire State.

  • On September 11, New York state regulators did a Friday News Dump: The Department of Environmental Conservation confirmed a large PFAS pollution site in East Hampton was explicitly tied to fighting a battery storage site fire. The investigation began after PFAS chemicals, known as “forever chemicals,” were detected in drinking water wells.
  • Investigators will still have to produce a final report, but in their bulletin confirming the pollution source, the agency said it is now working with state energy and fire officials to avoid a specific chemical fire suppression system identified as a potential culprit known as Novec 1230. “The investigation points to the fire suppression system, not battery storage, as a [PFAS] source,” the bulletin states, adding this system wasn’t used in other recent fires at BESS facilities.This defuses what was poised to be a new PR problem for the battery storage sector in a state where local moratoria and restrictive ordinances have become increasingly common.

2. Loudon County, Virginia – I can’t believe it: Data Center Alley is going to enact a moratorium.

Keep reading...Show less
Yellow
Q&A

The Case for a Data Center Dividend

A conversation with Sam Lyman of the Bitcoin Policy Institute.

•
The Bitcoin Policy Institute’s Sam Lyman.
Heatmap Illustration

This week’s conversation is with Sam Lyman, head of research at the Bitcoin Policy Institute. Originally focused on cryptocurrency, Lyman’s organization has expanded to policy and messaging development around data centers, most notably providing research many AI boosters cite to claim foreign influence is driving opposition to new hyperscale projects. Last week, the think tank released a new report calling for a novel solution to the data center permitting bottleneck: direct cash payments from data center projects to individuals involved with building them, as well as residents nearby facilities once they’re operating.

I reached out to BPI and asked for a chat with Lyman about the data center dividend proposal. I also tried to get to the bottom of where this increasingly relevant think tank stands on the general idea of a national data center law. The conversation was immensely informative. So here it is, in a lightly abridged and edited format.

Keep reading...Show less
Yellow
Spotlight

Trump Keeps Wind Farms Waiting Despite Court Ruling

The administration told a federal court that it has a “new analytical methodology,” hence the continued delays.

•
Trump measuring wind turbines.
Heatmap Illustration/Getty Images

A federal judge ruled in early August that the Trump administration’s freeze on vertical height clearances for wind turbines was likely illegal. More than a month later nearly all of the wind energy projects remain on pause, as federal officials add new red tape that industry representatives say runs afoul of the court’s edict.

Let’s catch-up quickly on the American wind sector’s existential dilemma: the federal government has control over airspace higher than 200 feet from the ground and wind farm turbines essentially always enter that sphere of control. For at least a year and a half, the Trump administration through the Department of Defense and the Federal Aviation Administration has slowly gummed up what industry and former government officials have said was once a rote, benign bureaucratic process for ensuring turbine rotation didn’t interfere with flight patterns or radar at nearby airports.

Keep reading...Show less
Yellow