Sign In or Create an Account.

By continuing, you agree to the Terms of Service and acknowledge our Privacy Policy

Energy

Google Is Cornering the Market on Energy Wonks

The hyperscaler is going big on human intelligence to help power its artificial intelligence.

•
The Google logo holding electricity.
Heatmap Illustration/Getty Images

Google is on an AI hiring spree — and not just for people who can design chips and build large language models. The tech giant wants people who can design energy systems, too.

Google has invested heavily of late in personnel for its electricity and infrastructure-related teams. Among its key hires is Tyler Norris, a former Duke University researcher and one of the most prominent proponents of electricity demand flexibility for data centers, who started in November as “head of market innovation” on the advanced energy team. The company also hired Doug Lewin, an energy consultant and one of the most respected voices in Texas energy policy, to lead “energy strategy and market design work in Texas,” according to a note he wrote on LinkedIn. Nathan Iyer, who worked on energy policy issues at RMI, has been a contractor for Google Clean Energy for about a year. (The company also announced Monday that it’s shelling out $4.5 billion to acquire clean energy developer Intersect.)

“To me, it’s unsurprising. I love the work of all the people they’ve been hiring,” Peter Freed, a former Meta energy executive and the founder of Near Horizon Group, told me. “Google has always been willing to do bleeding edge stuff — that’s one of the cool things about Google.”

Google declined to comment on its staffing moves, but other figures who have extensive energy experience argued that working at a big energy buyer like Google is a necessary step to becoming a well-rounded energy pro.

“I think that evangelists, technologists, compliance officers, and visionaries all have to be one and the same person, or a small gathering of a few people who can have and share all of those roles simultaneously,” Arushi Sharma Frank, an energy industry consultant and investor, told me of Google’s recent hiring push. She also told me that Spencer Cummings, the deputy chief digital officer at the Federal Energy Regulatory Commission, will soon join Google’s public service team, posting about the hire on LinkedIn. (Cummings himself did not respond to a request for comment.)

The spate of hiring suggests that Google sees its data center buildout and its longstanding clean energy goals as intertwined, and is throwing all the talent it can at the problem in an attempt to avoid unnecessary greenhouse gas emissions.

Google has been developing clean energy resources for almost 20 years, and has long been one of the most aggressive and innovative tech giants in creating new financial and legal structures to help support them.

After first matching its annual energy usage with renewable output in 2017, the company has since upped its goal, aiming to match its hour-by-hour energy use in the areas where its operations are actually located. This means making investments beyond wind and solar into more capital intensive and complex power generation, projects such as geothermal or even advanced nuclear.

At the same time, big tech companies are already facing political blowback from their buildouts of multi-billion-dollar, gigawatt-scale data centers for artificial intelligence at a time of rising electricity prices. Google has also been a leader in attempting to head off those issues, including by contracting with utilities to commit to paying the transmission costs over the long term so that they don’t get spread to the rest of a utility’s customers. Another way might be to have data centers work more intermittently, at times when the grid is least stressed, and thus not increase peak demand — i.e. the method Norris has proposed.

Google’s recent hiring indicates that these are strategies it will continue to refine as its data center buildout moves forward. Norris wrote on X that he’ll “be focused on identifying and advancing innovations to better enable electricity markets to accommodate AI-driven demand and clean energy technologies.” Lewin, meanwhile, said that his remit will be “creating and implementing strategies to integrate data centers into the grid in ways that lower costs for all energy consumers while strengthening the grid.”

That Google is after energy talent in Texas should be no surprise — the company is planning to invest some $40 billion in Texas alone through 2027, Google chief executive Sundar Pichai wrote on LinkedIn.

“In general, all of the tech companies are so flat out trying to deliver any megawatt of data center capacity they possibly can,” Freed said.

In its most recent quarter alone, Google’s parent company Alphabet spent $24 billion on capital expenditures, the “vast majority” of which was “technical infrastructure” split between servers, data centers, and networking equipment, Anat Ashkenazi, Alphabet’s chief financial officer, said in the company’s third quarter earnings call in October. Ashkenazi said that full-year capital expenditures would be between $91 billion and $95 billion this year — and that 2026 would see a “significant increase.”

That spending “will continue to put pressure” on profits, Ashkenazi said, and specifically called “related data center operation costs, such as energy” a factor in that.

The data center buildout also puts more pressure on Google’ sustainability goals. “While we remain committed to our climate moonshots, it’s become clear that achieving them is now more complex and challenging across every level,” the company said in its 2025 environmental report. The issue, Google said, was a mismatch between accelerating demand for energy and available supply of the clean stuff.

The “rapid evolution of AI” — an evolution that is being actively spurred on by Google — “may drive non-linear growth in energy demand, which makes our future energy needs and emissions trajectories more difficult to predict,” the company said in the report. As for clean energy, “a key challenge is the slower-than-needed deployment of carbon-free energy technologies at scale, and getting there by 2030 will be very difficult.”

It’s not lost on people — okay, not lost on me — that many of these Google hires are some of the most prominent voices in energy and electricity policy today, with largely independent platforms now being absorbed into a $3.7 trillion company. But while this might be a loss for the media industry as the roster of experts available for us to consult gets absorbed into the Googleplex, it’s likely a good thing for energy policy development overall, Sharma Frank said.

“I think that we are under-indexing in this country largely on how important it actually is for strong public voices to go inside impact-creation companies," she told me, adding — “and then for those companies to eventually release those people back out into the wild so that they can drive impact in new ways.”

Yellow
🔒

You’ve reached your free article limit

Subscribe to Heatmap News for unlimited access to daily energy and climate coverage.
To continue reading
Create a free account or sign in to unlock more free articles.
or
Please enter an email address
By continuing, you agree to the Terms of Service and acknowledge our Privacy Policy
The IBEW logo.
Heatmap Illustration/Getty Images

Building trades want to build.

This desire for more and better big projects has meant that unions representing construction workers, utility linemen, operating engineers, plumbers, pipefitters, and so on have spent past decade-plus ping-ponging between praise and exasperation toward major Democratic priorities, especially when it comes to climate and energy policy.

Keep reading...Show less
AM Briefing

Nuclear’s Near-Term Fix

On Indonesia’s climate win, hacking renewables, and John Cena’s ad

Google headquarters.
Heatmap Illustration/Getty Images

Current conditions: A tropical rainstorm in the southwestern Gulf of Mexico, likely strengthening into what would become Tropical Storm Isaias, is poised to dump rain on the southeastern United States and may become the Atlantic’s first major hurricane of the year • Italy is bracing for a type of heavy rainstorm known as a nubifragio, set to soak Naples and Rome later this week • The Dome Fire in Yosemite National Park has burned about 7,000 acres, and officials determined it was sparked by humans.


THE TOP FIVE

1. Google inks a deal to uprate 11 of Constellation’s nuclear reactors

If you can’t wait a decade or more for a new Westinghouse AP1000 or one of the small modular reactors under development, your best bet to get more nuclear electricity is probably to upgrade an existing reactor to squeeze more power out of it, a process known as “uprating.” In February, the Department of Energy gave out its largest-ever loan to Southern Company to fund up to 6 gigawatts of uprates across the utility’s nuclear fleet. Last week, Amazon inked a 20-year deal with Constellation, the nation’s largest operator of nuclear reactors, to buy power from and uprate the Calvert Cliffs plant in Maryland. Google has now signed a deal with Constellation aimed at wringing out 890 megawatts of new power from 11 reactors across PJM Interconnection, the nation’s second-largest and arguably most stressed grid system. Asked whether the uprates are a sufficient replacement for building new reactors, Raiford Smith, Google’s head of power and energy for the cloud, said there was plenty of demand to go around. “New data centers are coming on at a gigawatt a clip,” he told me yesterday. “That means even with all the uprates, there’s still more to come.” Software giant Oracle also announced a deal last week to buy $300 million of nuclear power from a NextEra nuclear plant in Wisconsin to help fund its increased fuel costs.

Keep reading...Show less
Blue
Podcast

The Tesla Alum Trying to Turn GM Into an American Battery Juggernaut

Rob talks with the U.S. auto giant”s VP of batteries and sustainability, Kurt Kelty.

A Denali EV.
Heatmap Illustration/General Motors

There are two big trends in the American battery sector at the moment. The first is that the electric vehicle market is deteriorating. GM, for instance, sold just 25,000 EVs in the third quarter of this year. Ford sold 6,000 EVs. Even the long-awaited return of the Chevy Bolt sold just 8,000 units — a small fraction of the vehicle’s already-limited production run. At the same time, the data center boom and the return of electricity growth is boosting batteries of all kinds not designed to power EVs.

Our guest today is in charge of navigating those opposing trends and figuring out what comes next. Kurt Kelty started his career at Panasonic in 1993, where he led the company’s battery research lab. He then went on to Tesla, helping to build the first Gigafactory. Since February 2024, he’s been vice president of battery and sustainability at GM. We talked about manufacturing generally, how the U.S. battery manufacturing sector should look, and how companies should be structured to compete globally, even though they’re making batteries for a mostly U.S. audience.

Keep reading...Show less
Yellow