The Fight

Sign In or Create an Account.

By continuing, you agree to the Terms of Service and acknowledge our Privacy Policy

Q&A

Why Data Centers Need Battery Storage

A chat with Scott Blalock of Australian energy company Wärtsilä.

Scott Blalock.
Heatmap Illustration/Getty Images

This week’s conversation is with Scott Blalock of Australian energy company Wärtsilä. I spoke with Blalock this week amidst my reporting on transmission after getting an email asking whether I understood that data centers don’t really know how much battery storage they need. Upon hearing this, I realized I didn’t even really understand how data centers – still a novel phenomenon to me – were incorporating large-scale battery storage at all. How does that work when AI power demand can be so dynamic?

Blalock helped me realize that in some ways, it’s more of the same, and in others, it’s a whole new ballgame.

The following chat was lightly edited for clarity.

So help me understand how the battery storage side of your business is changing due to the rise in data center development.

We’re really in the early stages for energy storage. The boom is really in generation – batteries aren’t generators. They store, they shift, they smooth power, but they don’t generate the power from fuel. In this boom right now, everyone is trying to find either grid connections or on-site power generation. Those are the longest lead time items – they take a while – so we’re still in the early stages of those types of projects coming back and saying, we need to start procuring batteries. We need to start looking at the controls and how everything’s going to work together. That’s still a little bit in the future.

Are you seeing people deploy batteries responsibly, in an integrated way, or is it people unsure what they need?

There’s definitely uncertainty as to what they need. The requirements are still hard to nail down. A lot of the requirements come from the load curve of the AI workloads they’re doing, and that’s still a bit of a moving target. It’s the importance of knowing the whole system and planning that out in the modeling space.

The biggest space of all this is the load profile. Without a load profile, there’s uncertainty about what you’re going to need –

When you say load profile, what do you mean?

The AI workload. The GPUs. The volatility. In a synchronized training load, all of the GPUs are generally doing the same thing at the same time. They all reach a pause state at the same time, and you’re close to full power on the data center, and then they say, okay now we go idle. It has a little bit of a wait and then starts back up again.

It’s that square wave, very sharp changes in power – that’s the new challenge of an AI data center. That’s one of the new uses of BESS that’s being added compared to the traditional data center doing data storage. They’re more stable which use less power and are more stable.

The volatility is where some of the friction comes in, and that has to be handled by some technology.

So what you’re telling me is that data center developers do not know how much they need in terms of battery storage? Simply put, they don’t know how much power they need?

Traditionally, utility-scale batteries – the projects we’ve been doing – come from a PPA, an interconnect agreement. There’s something in place where they know exactly how many batteries they can install. They know how many megawatts they’re allowed to install. Then they come to us and they say, I need a 4-megawatt battery for two hours. Tell me how many batteries you’re going to give me.

In a data center, they don’t know that first number. They don’t know how many megawatts they need. So that’s the first question: well, how big of a battery do you need?

If you have a 1-gigawatt data center that means the load change is 60% of that – 600 megawatts is the step up-and-down. The starting point is 600 megawatts for two hours. That’s the starting point that’ll cover being able to take care of that volatility. The duration is a part of it, too. From there you get into more detailed studies.

When it comes to transmission, how much of a factor is it in how much storage a data center needs?

The first thing is whether it’s connected at all. The battery is a shock absorber for the whole system. If you are grid-connected, the BESS is still a stability asset – it’s still improving the power quality and stability at an interconnect. If you’re doing on-site generation, it becomes vital because you have only one system being controlled.

As far as when you talk about permitting and transmission, the details of that don’t really play that much into the BESS, but it’s tangentially related. The BESS is an important part of how you handle that situation. Whether you get to interconnect or not, it’s an extremely important asset in that mix.

With respect to the overall social license conversation, how does battery storage fit into the conversations around energy bills and strain on the grid?

Bias aside, I think it’s the most important piece.

If you look at the macro scale, it’s like transitioning to renewables where they’re intermittent; batteries turn intermittent generation from renewables into firm, dispatchable power. It’s still not going to be available all the time – you’re not going to turn a solar plant into a 24-hour baseload plant – but a battery allows you to shift the energy. It greatly alleviates the problem.

The other aspect is it’s a stability asset. The short version of that is you have big thermal plants – rotating metal masses that have momentum to them that stabilize everything on the grid. As you take those offline, the coal plants and the gas plants, the grid itself loses that inertia so it is more susceptible to spikes and failures because of small events. Batteries are able to synthesize that inertia.

Yellow

This article is exclusively
for Heatmap Plus subscribers.

Go deeper inside the politics, projects, and personalities
shaping the energy transition.
To continue reading
Create a free account or sign in to unlock more free articles.
or
Please enter an email address
By continuing, you agree to the Terms of Service and acknowledge our Privacy Policy
Spotlight

Wind Industry Goes for Broke Against Trump

Senior executives at EDP, Apex, Pattern, and other large renewables companies did something remarkable in a recent court filing: They publicly criticized the administration.

Donald Trump and a wind turbine.
Heatmap Illustration/Getty Images

Major energy developers are going all in against the Trump administration in court, in what appears to be the first time many are publicly challenging the president in spite of any potential risk of retaliation.

As I chronicled, Trump is now effectively blocking any new wind projects in the U.S., utilizing federal authority over American aerospace to stop what was once a run-of-the-mill approval process for the height of turbines through the Federal Aviation Administration. They’ve done this by using the Defense Department to gum up the interagency review process, with the Pentagon holding up bureaucratic machinations citing vague, alleged national security concerns. Earlier this month, regional renewable energy trade groups filed a lawsuit against the Pentagon and FAA seeking a judicial order akin to what they’ve already won against the Interior Department’s anti-renewables permitting freeze. The case argues Trump can’t hold these routine processes up because, well, they’re mandated by law to ultimately clear things if they meet basic specifications. It arrives as the Trump administration appeals a separate lawsuit against the Interior Department’s de facto permitting freeze, which was formally filed today.

Keep reading...Show less
Yellow
Hotspots

The Renewables Battle Underway in Arizona

And more of the week’s top fights around development.

The United States.
Heatmap Illustration/Getty Images

1. Apache County, Arizona – Renewables developers are trying to head off restrictions in a coveted region of the sun-swept Arizona desert.

  • I’ve detailed how this county is a crucial battleground in the fight over local restrictions on renewable energy. So profound the conflict has been over renewables in Apache County that it helped spur a failed campaign to enact a statewide pause on wind development.
  • Well, the next engagement is underway: On June 3, the Apache County Planning and Zoning Commission recommended a temporary moratorium on future solar and wind development, responding to resident-run campaigns against specific projects.
  • I’ve noticed large advocacy non-profits have begun running hyperlocal letter campaigns to the Apache County Board of Supervisors asking pro-renewables voices to weigh in against the moratorium. Arizonans for a Clean Economy is running a sponsored ad on Google, resulting in a letter campaign popping up if you search renewable energy and the name of the state. “Send a letter today and ask your Supervisor to support policies that unleash Arizona’s energy potential while keeping costs low, conserving our water, and creating energy independence for Apache County,” their letter-writing website states.
  • Meanwhile, Veterans Power America, a national organization, is asking people to tell the board: “Clean energy projects can bring new revenue and economic opportunity to Apache County for Veterans like us. Don’t shut the door on progress.” (For what it's worth, I learned of this ad from anti-wind activists complaining about it on Facebook.)
  • What happens now is a procedural waiting game. The county will now go through a public notice and comment process ahead of formal consideration of the planning and zoning commission’s recommendations. While a decision isn’t imminent, I will be watching this one like the area’s sharp-shinned hawk.

2. Montgomery County, Alabama – A so-called “AI watchman” has won the GOP nomination for Alabama Public Service Commission, indicating how deeply frustrations run in red states against the nascent infrastructure buildout for artificial intelligence.

Keep reading...Show less
Yellow
Q&A

What Would Make the Data Center Boom Popular?

A conversation with Mark Muro, senior fellow at the Brookings Institute’s metro policy program

Mark Muro.
Heatmap Illustration

Today’s conversation is with Mark Muro, senior fellow at the Brookings Institute’s metro policy program. Too often I’m asked, what’s the version of a data center boom that people like? I reached out to Muro because he recently coauthored research into the ways communities and data centers can potentially work together to build more mutually beneficial and popular industry growth. The conversation wound up perfect for The Fight, so I had to include it in full.

The following Q&A was lightly edited for clarity.

Keep reading...Show less
Yellow